• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • Projects

    A selection of our ongoing and recently completed projects

All 16 /Case Studies 14 /Multi Utilities 2 /Testimonials 2

New Triple 11KV Circuits for National Grid at New Cross Hospital, Wolverhampton

11Kv, national, grid, doocey, group, agricultural , environmental

11Kv Cable Installation for National Grid in Ilfracombe, Devon

rising, main, pump, station, works, doocey, group, utilities, multi

Rising Main and Pump Station Works

hanch, hs2, onsite, apprentice

Raw Water Diversion in Hanch for HS2

vistry, partnerships, testimonial, doocey, group, multi, utilities

Vistry Partnerships

doocey, traffic, management, south, staffs, water, alrewas

Carriageway Repairs on the A38 Alrewas

western, power, distribution

Western Power Distribution

sprint, bus, doocey, shelter, west, midlands, combined, authority

Sprint Bus Stop Construction for West Midlands Combined Authority

cable, holbeach, doocey, group

Installation of 33kV Cable Circuit and 11kV Cable Circuit from Holbeach 33/11kV Primary Substation to Whaplode

swansley, trencher, doocey, cambridge

West Cambourne Booster Reinforcement

wyggeston, burton, upon, trent, doocey, group, cadent

Renewal Scheme at Wyggesston Street, Burton-Upon-Trent

doocey, group, stroud, western, power, distribution, cable

Doocey Group Flying High

wath, uni, valve, uni-valve, doocey, group, pipeline, resilience

New Innovative Wath Uni-Valve Installed

doocey, group, hinksford, pipeline, resilience, south, staffs, water

400mm Line stop and 80mm PN25 UPT

south, staffs, water, doocey, group, vac, ex,

Complicated Upgrade for South Staffs Water

doocey, group, bristol, university, western, power, distribution

Bristol University WPD 33KV Underground Cable Overlay

Page 2 of 41234

Latest Case Studies

  • kinver, water, main, excavation, doocey, group
    Kinver 24″ Pipe Bridge Burst Water Main3rd June 2026 -
  • doocey, group, hampton, loade, water, mains
    Hampton Loade Phase 2 Station9th April 2026 -
  • cambridge, water, south, station, main, replacement
    Cambridge South Station (Water Main Replacement)18th February 2026 -
  • raf, bulford, Annington, properties, Foul, Water, Electricity, Separation, Scheme, doocey, group
    Foul, Water and Electricity Separation Scheme – RAF Bulford26th November 2025 -
  • electric, vehicle, charging, corley, services, welcome, break, doocey, group
    Electrical Supply to Support Four New Electric Vehicle (EV) Chargers – Corley Services South26th November 2025 -
  • Student, Accommodation Development, Electrical, Infrastructure, Leeds
    Student Accommodation Development Electrical Infrastructure – Leylands Road, Leeds26th November 2025 -
  • university, warwick, doocey, group, utility, diversion
    Utility Diversions for The University of Warwick26th November 2025 -
aston, villa, community, partner, doocey, group

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Statement

Follow us

  • linkedin
  • twitter
  • instagram
©2026 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top