• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • Projects

    A selection of our ongoing and recently completed projects

All 16 /Case Studies 16
kinver, water, main, excavation, doocey, group

Kinver 24″ Pipe Bridge Burst Water Main

doocey, group, hampton, loade, water, mains

Hampton Loade Phase 2 Station

cambridge, water, south, station, main, replacement

Cambridge South Station (Water Main Replacement)

raf, bulford, Annington, properties, Foul, Water, Electricity, Separation, Scheme, doocey, group

Foul, Water and Electricity Separation Scheme – RAF Bulford

electric, vehicle, charging, corley, services, welcome, break, doocey, group

Electrical Supply to Support Four New Electric Vehicle (EV) Chargers – Corley Services South

Student, Accommodation Development, Electrical, Infrastructure, Leeds

Student Accommodation Development Electrical Infrastructure – Leylands Road, Leeds

university, warwick, doocey, group, utility, diversion

Utility Diversions for The University of Warwick

hampton, loade, trimpley, water, diversion, doocey, severn, trent, south, staffs

Hampton Loade 1200mm Connection

Installation, trenchless, hs2, Doocey, group, western, power, distribution, reinstatement, excavation

HS2 Bromford Tunnel (Eastern Portal) Water Orton

tewkesbury, MOD, doocey, cables, MOD

Tewkesbury MOD – 11kV Ashchurch

Gravity/AGRATAS – 45MVA Scheme

Birmingham Children’s Hospital – 11kV Reinforcement Scheme

portbury, docks, doocey, electric, bristol, cable, fault, national, grid

Portbury Docks – Keeping the Lights On

cambridge, south, station, water, diversion, doocey, group

Cambridge South Station Water Diversion

a51, whittington, hs2, water, doocey, group

HS2 600mm Water Diversion – A51 Whittington

south, staffs, water, diversion, doocey, group

South Staffs Water Reservoir 36” Disconnection Barr Beacon Great Barr

Page 1 of 41234

Latest Case Studies

  • kinver, water, main, excavation, doocey, group
    Kinver 24″ Pipe Bridge Burst Water Main3rd June 2026 -
  • doocey, group, hampton, loade, water, mains
    Hampton Loade Phase 2 Station9th April 2026 -
  • cambridge, water, south, station, main, replacement
    Cambridge South Station (Water Main Replacement)18th February 2026 -
  • raf, bulford, Annington, properties, Foul, Water, Electricity, Separation, Scheme, doocey, group
    Foul, Water and Electricity Separation Scheme – RAF Bulford26th November 2025 -
  • electric, vehicle, charging, corley, services, welcome, break, doocey, group
    Electrical Supply to Support Four New Electric Vehicle (EV) Chargers – Corley Services South26th November 2025 -
  • Student, Accommodation Development, Electrical, Infrastructure, Leeds
    Student Accommodation Development Electrical Infrastructure – Leylands Road, Leeds26th November 2025 -
  • university, warwick, doocey, group, utility, diversion
    Utility Diversions for The University of Warwick26th November 2025 -
aston, villa, community, partner, doocey, group

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Statement

Follow us

  • linkedin
  • twitter
  • instagram
©2026 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top