• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • Projects

    A selection of our ongoing and recently completed projects

All 3 /Case Studies 3
doocey, group, 3005, metre, Cable, Pull, A46, Evesham, western, power, distribution

3005m Cable Pull A46 Evesham

doocey, group, ground, works, sandwell, aquatics, centre

Sandwell’s Commonwealth Games Aquatics Centre

Doocey Group – The Fourth Emergency Service

Page 4 of 41234

Latest Case Studies

  • hampton, loade, trimpley, water, diversion, doocey, severn, trent, south, staffs
    Hampton Loade 1200mm Connection15th April 2025 -
  • Installation, trenchless, hs2, Doocey, group, western, power, distribution, reinstatement, excavation
    HS2 Bromford Tunnel (Eastern Portal) Water Orton14th April 2025 -
  • tewkesbury, MOD, doocey, cables, MOD
    Tewkesbury MOD – 11kV Ashchurch8th April 2025 -
  • Gravity/AGRATAS – 45MVA Scheme8th April 2025 -
  • Birmingham Children’s Hospital – 11kV Reinforcement Scheme8th April 2025 -
  • portbury, docks, doocey, electric, bristol, cable, fault, national, grid
    Portbury Docks – Keeping the Lights On5th March 2025 -
  • cambridge, south, station, water, diversion, doocey, group
    Cambridge South Station Water Diversion14th February 2025 -

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Statement

Follow us

  • linkedin
  • twitter
  • instagram
©2023 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top