• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • Traffic Management

    Available 24 hours a day, all year round

doocey, traffic, management

Traffic Management

Established in 2006, Doocey Traffic Management is a multi-disciplined, Traffic Management Company operating nationwide.

We provide a complete range of Traffic Management Services including:

• Consultancy services

• Temporary traffic signals

• Lane closures

• High speed and street works management

• Road closures

• Hire and sales packages

• Complete with our custom maintenance package to suit all infrastructures.

24/7 Operation | 24/7 Quality as standard
Recognising that the key to success is the quality of staff, an ongoing investment in training enables staff in all areas of the team to respond to the changing requirements of construction technology and provide the highest standards of service to clients.
The operation of the business is supported by a totally integrated management system which is supported by accreditations to ISO9001 for Quality, ISO14001 for Environment and ISO18001 for Health & Safety. These, together with a continued investment in Information Technology, ensure the efficient operation of the company for the benefit of all clients.

Our clients are of paramount importance, something that has led to many long term relationships being developed and a significant proportion of repeat business being secured.

Visit Traffic Management Website
Doocey, Traffic, Management
Doocey, Traffic, Management
BSI, ISO9001, quality, management, IOS, 14001, Environmental, Management, OHSAS, 18001, Occupational, Health, Safety
  • Civil Engineering
  • Groundworks
  • Pipeline Resilience
  • Gas Networks
  • Power Networks
  • Water Networks
  • Multi Utility Services
  • Traffic Management
  • Recycling
  • Water Quality Testing & Commissioning
  • Directional Drilling

Doocey Group News

  • doocey, kubota, excavatorStraight to Work for Our New Fleet of 5T Excavators6th April 2022 -
  • bcu, live, careers, event, doocey, group, recruitment, birmingham, city, universityDoocey Group Attend the Live Careers Event at BCU10th March 2022 -
  • doocey, group, birmingham, children, hospital charity, fundraiser£315 Raised for Birmingham Children’s Hospital14th December 2021 -
  • doocey, group, holbeach, sub, stationDoocey Group Awarded 14km 33Kv & 3.5Km 11Kv Underground Cable Project by WPD5th July 2021 -
  • Ryeford to Dudbridge CableDoocey Awarded 22.8Km of 33Kv Underground Cable Project5th June 2021 -
  • construction line, gold, member, doocey, group, traffic, managementDoocey Traffic Management Achieve 2021 Gold28th May 2021 -
  • mental, health, awareness, week, doocey, groupEmbrace Mental Health Awareness Week13th May 2021 -

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Policy

Follow us

  • linkedin
  • twitter
  • instagram
©2022 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top