• Twitter
  • LinkedIn
  • Instagram
  • News
  • Recruitment
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Pipeline Resilience
      • Under Pressure Drilling
      • Line Stopping
      • Pipe Cutting/Cold Cutting
      • Under Pressure Valves
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
  • Contact
  • Search
  • Menu Menu
  • Environment

    Taking the environment to the next level

ENVIRONMENT

Our companies Environmental Management System is accredited to BSEN ISO : 14001:2004

In order to maintain this accreditation we are audited for 2 days by BSI every 6 months. Since gaining this accreditation in 2008, we are proud to report that no fines, prosecutions, prohibitions or improvement notices have been served from ES or LAS.

Our plant allows production of industry accredited products such as CBEM 3, recycled type 1 stone, pipe bed & topsoil.

All our fleet are installed with fully operational tracker systems, which enables the company to monitor vehicle journey times, maintain security, increase vehicle efficiencies, increase driver awareness and most of all enables better fuel economy with reductions to the company’s carbon emissions.

80% of our workforce hold a nationally accredited environmental qualification
0%
100% of our management team hold a nationally accredited environmental qualification
0%
Our current annual recycling of waste meets 93% target. We own and operate a recycling centre in the centre of the UK
0%
BSI, ISO9001, quality, management, IOS, 14001, Environmental, Management, OHSAS, 18001, Occupational, Health, Safety

Our Track Record with The Environmental Management of Waste Water

Our waste water operations management team have gained unrivalled experience in delivering innovative sewer network installation and repair services, by taking care and always exceeding our clients’ expectations on every project.

What is CBEM3

CBEM3is an innovative backfill material as it is self levelling, requires no compaction and even allows difficult waste materials including clay to be put back into excavations by encapsulating them in a cement matrix.

What makes this process unique is the ability to use every part of the waste – even clays – ensuring practically nothing is sent to landfill. CBEM3 takes the Environment agenda to the next level by creating a recycled material that is superior in quality to most traditional backfills whilst being cheaper.

Doocey CBEM3 Recycling takes the Environment agenda to the next level, by creating a recycled material that is superior in quality to most traditional backfills whilst being cheaper. In four years, almost 100,000 tonnes of waste, which would have otherwise gone to landfill, has been recycled.

We utilise fleet tracker technology to locate our vehicles to increase vehicle efficiencies.

  • Compliance
  • Environment
  • Health & Safety
  • Quality
  • Community
  • Training

Doocey Group News

  • Doocey Trial Electric JCB Mini Digger12th February 2021 -
  • covid-19, coping, mental, health, doocey, groupCoping With Covid5th February 2021 -
  • doocey, traffic, management, davies, nathanTackling Youth Unemployment and Attracting New Talent4th February 2021 -
  • oxfordshire, wpd, doocey, group, contractDoocey Group Awarded 11Kv WPD Project in Oxfordshire4th February 2021 -
  • doocey, traffic, management, utilities, christmas, water, electric, repairsA Busy Christmas for Doocey Group on Water and Electric5th January 2021 -
  • astrazenica, cambridge, works, water, electricDoocey Group Deliver Works at the New AstraZeneca Flagship Headquarters29th December 2020 -
  • doocey, group, traffic, management, IPV, lorryDTM Purchase Additional IPV Lorry4th December 2020 -

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Policy

Follow us

  • linkedin
  • twitter
  • instagram
©2021 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top