• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • Traffic Management

    Available 24 hours a day, all year round

doocey, traffic, management

Traffic Management

Established in 2006, Doocey Traffic Management is a multi-disciplined, Traffic Management Company operating nationwide.

We provide a complete range of Traffic Management Services including:

• Consultancy services

• Temporary traffic signals

• Lane closures

• High speed and street works management

• Road closures

• Hire and sales packages

• Complete with our custom maintenance package to suit all infrastructures.

24/7 Operation | 24/7 Quality as standard
Recognising that the key to success is the quality of staff, an ongoing investment in training enables staff in all areas of the team to respond to the changing requirements of construction technology and provide the highest standards of service to clients.
The operation of the business is supported by a totally integrated management system which is supported by accreditations to ISO9001 for Quality, ISO14001 for Environment and ISO18001 for Health & Safety. These, together with a continued investment in Information Technology, ensure the efficient operation of the company for the benefit of all clients.

Our clients are of paramount importance, something that has led to many long term relationships being developed and a significant proportion of repeat business being secured.

Visit Traffic Management Website
Doocey, Traffic, Management
Doocey, Traffic, Management
BSI, ISO9001, quality, management, IOS, 14001, Environmental, Management, OHSAS, 18001, Occupational, Health, Safety
  • Civil Engineering
  • Groundworks
  • Pipeline Resilience
  • Gas Networks
  • Power Networks
  • Water Networks
  • Multi Utility Services
  • Traffic Management
  • Recycling
  • Water Quality Testing & Commissioning
  • Directional Drilling

Doocey Group News

  • £54k Raised at the Doocey Group Annual Charity Golf Day11th June 2025 -
  • CPD, VanDemand, doocey, fleet, vehicles
    £1 Million Order Completed for Doocey Group24th February 2025 -
  • Doocey Group – Finalists at the British HR Awards 202524th February 2025 -
  • spinners, yard, leeds, city, centre, cables, water, electricity, 11kv, regent, street
    New 11 Storey Apartment Complex in Leeds City Centre17th February 2025 -
  • rising, main, pump, station, works, doocey, group, utilities, multi
    Rising Main and Pump Station Works10th February 2025 -
  • doocey, group, charity, golf, day, 2024, great, barr, golf, club, birmingham, hospice
    £55k Raised at the 2024 Doocey Charity Golf Day11th June 2024 -
  • mental, health, awareness, week, doocey, group
    Mental Health & Wellbeing Week20th May 2024 -

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Statement

Follow us

  • linkedin
  • twitter
  • instagram
©2023 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top