• Twitter
  • LinkedIn
  • Instagram
  • News
  • Jobs
Contact us on 0121 520 9874
Doocey Group
  • Home
  • About Us
    • Our Company
    • Accreditations
    • Senior Management
    • Our History
    • Core Values
  • Services
    • Civil Engineering
      • Sewerage & Drainage
      • Tank & Shaft Construction
      • Cross-country Pipelines
      • Pumping Stations
      • Retaining Structures
    • Utilities
      • Multi Utility Services
      • Gas Networks
      • Water Networks
      • Power Networks
    • Traffic Management
      • Street Works 12d
      • High Speed 12a/b
      • Event Management
    • Groundworks
      • Site Clearance, Remediation and Earthworks
      • Groundworks
      • External Works
      • Roads and Sewers
      • Attenuation, Balancing Ponds, Swales and Soakaways
    • Pipeline Resilience
      • Line Stopping
      • Under Pressure Drilling
      • Under Pressure WATH Uni-Valve
      • Pipe Cutting / Cold Cutting
      • Bespoke Pipework & Fittings
    • Recycling
      • CBEM3
      • Aggregates
      • Concretes
      • Soil
    • Directional Drilling
      • Telecommunications
      • Gas
      • Water
      • Electric
    • Testing & Commissioning
      • Testing
      • Swabbing
      • Chlorination & De-chlorination
      • Sampling
  • Sustainability
    • Health & Safety
    • Quality
    • Environment
    • Compliance
    • Community
    • Training
  • Case Studies
    • News
    • Testimonials
  • Contact
  • Search
  • Menu Menu
  • About Doocey Group

    An increasingly diverse offer built on long term relationships

Quality You Can Build On

Doocey Group is a multi-disciplined, civil engineering and utility contractor operating nationally.
We provide a complete range of utility and civil engineering services including multi-utilities as well as single services. Our services include:

• Water                         • Drainage
• Gas                              • Structures
• Electricity                    • Highways
• Full Infrastructure       • Training
• Pipelines                  

Recognising that the key to success is the quality of staff, an on-going investment in training enables staff in all areas of the team to respond to the changing requirements of construction technology and provide the highest standards of service to clients.

The operation of the business is supported by a totally integrated management system which is supported by accreditations to ISO 9001 for Quality, to ISO 14001 for Environment and to ISO 45001 for Health and Safety.

These together with a continued investment in information technology ensure the efficient operation of the company for the benefit of all clients.

Long term relationships with an ever growing diversity

Our clients are of paramount importance, in consequence of which many long term relationships have developed and provide a significant proportion of repeat business.

These relationships are evidence of the confidence and trust in which the company is held.

BSI, ISO9001, quality, management, IOS, 14001, Environmental, Management, OHSAS, 18001, Occupational, Health, Safety
doocey, digger, ground, works
doocey, grab, lorry
plant, hire, doocey
doocey, directional, drilling

  • Accreditations
  • Senior Management
  • Our History
  • Core Values

Latest Case Studies

  • hampton, loade, trimpley, water, diversion, doocey, severn, trent, south, staffs
    Hampton Loade 1200mm Connection15th April 2025 -
  • Installation, trenchless, hs2, Doocey, group, western, power, distribution, reinstatement, excavation
    HS2 Bromford Tunnel (Eastern Portal) Water Orton14th April 2025 -
  • tewkesbury, MOD, doocey, cables, MOD
    Tewkesbury MOD – 11kV Ashchurch8th April 2025 -
  • Gravity/AGRATAS – 45MVA Scheme8th April 2025 -
  • Birmingham Children’s Hospital – 11kV Reinforcement Scheme8th April 2025 -
  • portbury, docks, doocey, electric, bristol, cable, fault, national, grid
    Portbury Docks – Keeping the Lights On5th March 2025 -
  • cambridge, south, station, water, diversion, doocey, group
    Cambridge South Station Water Diversion14th February 2025 -

Head Office

The Old Stables
Watery Lane
(off Alexandra Road)
Tipton, West Midlands
DY4 8NA

Telephone: 0121 520 9874

Fax: 0121 520 9828

Sat Nav: please use postcode DY4 8TB

Contact Us

More Information

  • News
  • Case Studies
  • Privacy Policy
  • Modern Slavery Statement

Follow us

  • linkedin
  • twitter
  • instagram
©2023 M&A Doocey Civil Engineering Limited | Site by NCVC
  • Twitter
  • LinkedIn
  • Instagram
Scroll to top